MUTOH Rockhopper II Series Guida Utente Pagina 71

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 95
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 70
Handling Roll Media – User’s Guide
71
AP-75100, Rev. 2.0, 26/11/04
Step 8 :
Perform the alignment procedure. After inserting the adjusting spacers (if necessary), fix the Rail assembly with 2 spacers and 2 cap screws on each side.
Assemble the waste-ink tank holder. Assemble the cable connecting the operating panel to the PCB-box.
Connect the foot switch (third connector next to the power inlet)
Vedere la pagina 70
1 2 ... 66 67 68 69 70 71 72 73 74 75 76 ... 94 95

Commenti su questo manuale

Nessun commento